MANHATTAN BEACH CIVIC CENTER/LIBRARY/METLOX ENVIRONMENTAL IMPACT REPORT
TABLE OF CONTENTS
I. INTRODUCTION (PDF) – 241 KB
II. EXECUTIVE SUMMARY (PDF) – 103 KB
III. PROJECT DESCRIPTION (PDF) – 650 KB
IV. OVERVIEW OF THE ENVIRONMENTAL SETTING (PDF) – 44 KB
V. ENVIRONMENTAL IMPACT ANALYSIS
A. Aesthetics/Views (PDF) – 998 KB
B. Air Quality (PDF) – 95 KB
C. Land Use (PDF) – 224 KB
D. Public Services/Police Protection (PDF) – 54 KB
E. Risk Of Upset (PDF) – 47 KB
F. Transportation/Circulation (PDF) – 2412 KB
G. Hydrology/Water Quality (PDF) – 98 KB
H. Noise (PDF) – 185 KB
VI. GENERAL IMPACT CATEGORIES (PDF) – 68 KB
VII. ALTERNATIVES TO THE PROPOSED PROJECT (PDF) – 185 KB
A. No Project Alternative
B. Civic Center Development Only
C. Metlox Development Only
D. Reduced Density Alternative
E. Increased Parking Alternative
F. Alternative Mixed-Use Metlox Development
G. Environmentally Superior Alternative
VIII. ORGANIZATIONS, REFERENCES, AND ACRONYMS AND ABBREVIATIONS (PDF) – 50 KB
A. Organizations and Individuals Contributing to the EIR
B. References
C. Acronyms And Abbreviations
IX. APPENDICES – (PDF) – 32 KB
A. NOP, NOP Comment Letters, And Initial Study
B. Air Quality And Noise Technical Report (provided under separate cover)
C. Project Traffic Study (provided under separate cover)
FINAL EIR SUPPLEMENT/REVISIONS
LIST OF FIGURES (in sections above)
Figure 1 Historic Aerial Photographs of the Project Area
Figure 2 Historic Photographs of the Metlox Potteries Property
Figure 3 Regional Location Map
Figure 4 Vicinity Map
Figure 5 Conceptual Site Plan
Figure 6 Illustrative Aerial Perspective From 15th Street
Figure 7 Illustrative Aerial Perspective From Manhattan Beach Boulevard & Valley Drive
Figure 8 Photograph Location Map
Figure 9 Views 1 and 2
Figure 10 Views 3 and 4
Figure 11 Views 5 and 6
Figure 12 Views 7 and 8
Figure 13 Views 9 and 10
Figure 14 Views 11 and 12
Figure 15 Views 13 and 14
Figure 16 Views 15 and 16
Figure 17 Views 17 and 18
Figure 18 Views 19 and 20
Figure 19 Views 21 and 22
Figure 20 Illustrative View of Town Square From Manhattan Beach Boulevard
Figure 21 Illustrative View of Town Square From Valley Drive
Figure 22 Area District III - Zoning Map
Figure 23 CD Downtown Commercial District Height Limits
Figure 24(a) Existing (2000) Traffic Volumes Winter Weekday AM Peak Hour
Figure 24(b) Existing (2000) Traffic Volumes Winter Weekday PM Peak Hour
Figure 25(a) Existing (2000) Traffic Volumes Summer Weekday AM Peak Hour
Figure 25(b) Existing (2000) Traffic Volumes Summer Weekday PM Peak Hour
Figure 26(a) Existing (2000) Traffic Volumes Summer Weekends Saturday Peak Hour
Figure 26(b) Existing (2000) Traffic Volumes Summer Weekends Sunday Peak Hour
Figure 27 Project Traffic Volumes Distribution Percentages
Figure 28(a) Project Volumes Only AM Peak Hour
Figure 28(b) Project Volumes Only PM Peak Hour
Figure 28(c) Project Volumes Only Weekend Peak Hour
Figure 29(a) Future (2005) Traffic Volumes Winter Weekday Without Project AM Peak Hour
Figure 29(b) Future (2005) Traffic Volumes Winter Weekday Without Project PM Peak Hour
Figure 30(a) Future (2005) Traffic Volumes Summer Weekday Without Project AM Peak Hour
Figure 30(b) Future (2005) Traffic Volumes Summer Weekday Without Project PM Peak Hour
Figure 31(a) Future (2005) Traffic Volumes Summer Weekend Without Project Saturday Peak Hour
Figure 31(b) Future (2005) Traffic Volumes Summer Weekend Without Project Sunday Peak Hour
Figure 32(a) Future (2005) Traffic Volumes Winter Weekday With Project AM Peak Hour
Figure 32(b) Future (2005) Traffic Volumes Winter Weekday With Project PM Peak Hour
Figure 33(a) Future (2005) Traffic Volumes Summer Weekday With Project AM Peak Hour
Figure 33(b) Future (2005) Traffic Volumes Summer Weekday With Project PM Peak Hour
Figure 34(a) Future (2005) Traffic Volumes Summer Weekend With Project Saturday Peak Hour
Figure 34(b) Future (2005) Traffic Volumes Summer Weekend With Project Sunday Peak Hour
Figure 35 Existing Stormwater Drainage Patterns
Figure 36 Common Noise Levels
Figure 37 Sensitive Noise Receptor Locations
LIST OF TABLES
Table 1 Civic Center Metlox Development Project EIR Executive Summary
Table 2 Civic Center/Metlox Development Project Summary Of Proposed Uses
Table 3 State And National Ambient Air Quality Standards
Table 4 Criteria Pollutant Violations (1997-1999)
Table 5 Existing Carbon Monoxide (Co) Concentrations
Table 6 SCAQMD Daily Emissions Thresholds
Table 7 Daily Construction Emissions
Table 8 Daily Operations Emissions
Table 9 2005 Worst-Case Co Concentrations
Table 10 Estimated Daily PM10 Emissions Reduction With Mitigation
Table 11 City of Manhattan Beach General Plan Land Use Policies
Table 12 Civic Center / Metlox Development Density Analysis
Table 13 Critical Movement Volume Ranges for Determining Levels of Service (LOS) Values
Table 14 Level of Service as a Function of CMA Values
Table 15 Summary of Existing (2000) Traffic Conditions
Table 16 Summary Of Project Trip Generation
Table 17 Code Parking Requirements For Downtown Manhattan Beach
Table 18 Summary of Shared Parking Demand Calculations
Table 19 City of Manhattan Beach Significance Criteria for Determining Traffic Impacts
Table 20 Critical Movement Analysis Summary of Existing (1999) and Future (2005) Traffic Conditions With and Without the Project – Winter Weekdays
Table 21 Critical Movement Analysis Summary of Existing (2000) and Future (2005) Traffic Conditions With and Without the Project – Summer Weekdays
Table 22 Critical Movement Analysis Summary of Existing (2000) and Future (2005) Traffic Conditions With and Without the Project – Summer Weekends
Table 23 Community Noise Exposure Compatibility Chart
Table 24 City Of Manhattan Beach Exterior Noise Standard
Table 25 Measured Noise Levels (dBA Leq)
Table 26 Estimated Community Noise Equivalent Level (Dba)
Table 27 Typical Outdoor Construction Noise Levels
Table 28 Construction Noise Impacts (Dba Leq)
Table 29 Estimated Community Noise Equivalent Level (dBA)
Table 30 Construction Noise With Mitigation (Dba Leq)
Table 31 Civic Center Only Development Alternative
Table 32 Metlox Development Only Alternative
Table 33 Reduced Density Alternative
Table 34 Daily Operation Emissions – Reduced Density Alternative
Table 35 Critical Movement Analysis Summary – Reduced Density Alternative
Table 36 Alternative Mixed-Use Metlox Development
Table 37 Daily Operational Emissions – Alternative Mixed Use Metlox Development
Table 38 Critical Movement Analysis Summary – Alternative Mixed Use Metlox Alternative
Table 39 Comparison of Project and Alternatives Impacts