Starting or Under Construction
Replace pipes with deficient fire flow capacity
Reduce pollutants that enter Santa Monica Bay
Design Phase
Install new pump to handle peak domestic service
Replace lift station with gravity line
Reconstruct lift station, upsize wet well, and install a second force main
Upgrade lift station, upsize wet well, and install second force main
Install infiltration system to improve water quality
Improve sewer infrastructure
Alleviate flooding issues for residents of Peck Ave and Marine Ave
Improve long-standing water quality issues and fire flow capacity in the El Porto Area
Closeout
Replace existing reservoir as it has exceeded its useful life
Install equipment to streamline water and wastewater billing processes