Departments » Public Works » Engineering Division » Capital Improvement Program (CIP) Project Updates
Starting or Under Construction
Install or replace 10 ADA-compliant curb access ramps at various locations.
Design Phase
Install a missing sidewalk to provide safety access
Widen intersection to alleviate traffic congestion
Upgrade and connect signal controller equipment to optimize signal timing
Modify intersection configuration to relieve traffic congestion
Improve merging area and reconfigure layout for smoother traffic flow
Repair and maintain streets throughout the City
Closeout
Apply slurry seal mix to extend overall pavement life
Repair, remove, or replace damaged pavements
Improve high flow crossing areas to enhance pedestrian safety